PIA Bldg, Visayas Ave, Diliman,  
Official website: http://www.pia.gov.ph/
connect now
Cancel
Cancel
Cancel
MIWD steps up efforts to increase water supply
 
ILOILO CITY, Iloilo  ·  
By Elsa S. Subong
posted 19-Aug-2012  ·  
0 comments
The Metro Iloilo Water District (MIWD) has taken steps to increase its water supply for its consumers as the bulk water suppliers have yet to become operational.

MIWD Manager Lee Jayme Jalbuena said they have drilled two deep wells along the
Tigum River in Bgy. Tabucan, Cabatuan to increase its supply by at least 40
liters per second.

Jalbuena said these two production well, built by Negros Rotadrill, Inc. cost about P2.3 million, inaugurated August 17.

He said the additional volume of water can serve about 2,800 households in Iloilo
City and the towns of Cabatuan, Sta. Barbara, and Pavia.

Jalbuena added that MIWD will soon build additional wells in Oton and San Miguel to
extract 5,000 cubic meters of water per day.

Further, it will also pursue the construction of centralized treatment facilities in
these towns to guarantee the safety and quality of water supply from ground
sources.

“We are also improving our service by rehabilitating old and dilapidated pipelines
and pumping stations in Lapaz, Lapuz and Jaro districts,” Jlabuena said.

Meanwhile,Local Water Utilities Administration Chairman Rene Villa said these initiatives augment the water supply but they still do not solve the water crisis in the
city and province.

Villa said the solution is in the hands of the Flo Water Resources Iloilo, Inc.,
contractor of the P1.3-billion bulk water supply project, which failed to operationalize
it last March 26 as agreed.

The supplier failed because of lack of permit yet from the National Water Resources
Board, and some other requirements not complied with.

Villa said the supplier promised to complete the project by October 16 this year and pay for the liquidated damage caused by the delay.

The bulk water supply aims to deliver an additional 25,000 cubic meters of water
per day to MIWD consumers, coming from two injection points – Sta. Barbara to
Pavia, and Leganes to Jaro. (JCM/ESS/PIA-Iloilo)
0 comments
New to ugnayan?
leave a comment, you need to connect.
Connect thru
Cancel
Cancel
Cancel
56
views
share
like
posted
19-Aug-2012
ugnayan © 2013
online: 
24 visitors